t81-foundation

T81 Contributor Roadmap

Engineering Maintenance, Experimental Validation, and Research Priorities

Updated: October 28, 2026

This roadmap connects the engineering maintenance program to T81’s active scientific research.

T81 Foundation is an experimental computing research platform investigating balanced-ternary representation, alternative execution architectures, deterministic computation, artifact integrity, authorization, and potential hardware-level advantages.

The central scientific question remains unresolved:

Can ternary representation or computation demonstrate a reproducible, practically meaningful advantage over an appropriately optimized conventional alternative under equivalent conditions?

The purpose of this roadmap is to help contributors identify work that advances that question without expanding architectural scope prematurely.

Authoritative references

The continuity charter and canonical H01–H08 register remain authoritative for research lineage and hypothesis identity.

This roadmap does not supersede historical findings, alter accepted experimental thresholds, or convert architectural proposals into implementation commitments.

Current research posture

T81 has accumulated substantial experimental infrastructure across languages, virtual machines, model execution, storage, provenance, and hardware exploration.

However, several proposed ternary-specific advantages remain unsupported or unresolved.

Current evidence includes:

These results are bounded to their tested workloads, implementations, and assumptions.

They do not establish that ternary computing is inherently inferior, nor do they demonstrate an architectural advantage.

Evidence classifications

Contributors must distinguish:

A passing regression suite does not automatically establish scientific validity.

A successful prototype does not automatically establish a performance advantage.

Phase 1: Establish trustworthy experimental comparators

Priority: Immediate

Primary goal: Ensure that T81 and conventional baselines perform equivalent, independently verifiable work before architectural comparisons are interpreted.

Investigation 08 — Current acceptance gate

PR #602 introduces an equivalent conventional comparator for a bounded model-dependent, two-layer attention workload.

Independent review at commit 7c61afa3ba0e97c3c800ca5cde567cf374d7a5cc reported:

The identified discrepancy is that the comparator does not require five tensors mandated by production. A correctly re-encoded model missing one such tensor can be accepted and persisted by the comparator while production rejects it.

Required next work

  1. Correct the five missing mandatory-tensor admission checks in the existing PR.
  2. Add differential negative tests for each omitted tensor.
  3. Verify that rejected models do not produce comparator task artifacts.
  4. Preserve all passing computational, authorization, CAS, and replay tests.
  5. Obtain independent confirmation of the focused correction.
  6. Record the final acceptance disposition before using the comparator as an experimental reference.

Success criteria

Exit condition: The comparator is accepted for its explicitly defined workload.

This does not establish full Llama inference equivalence, continuous task-policy enforcement within the VM, or ternary architectural superiority.

Phase 2: Measure subsystem advantages under controlled conditions

Priority: After Phase 1 acceptance

Primary goal: Determine whether any observed difference is attributable to ternary representation or computation rather than implementation language, unequal functionality, or experimental design.

Experimental dimensions

Evaluate separately:

  1. Arithmetic and tensor execution.
  2. Representation and storage density.
  3. Memory traffic and data movement.
  4. Model loading and artifact processing.
  5. Authorization and provenance overhead.
  6. Integrated end-to-end execution.

Where applicable, distinguish ternary-specific effects from general runtime engineering improvements.

Measurement requirements

Each experiment should define:

A preliminary measurement-protocol check is not equivalent to a statistically supported performance conclusion.

For Investigation 08, the previously proposed 30 paired observations per condition remain a planning target unless the experiment’s approved protocol specifies otherwise.

Success criteria

Exit condition: The research record supports a defensible conclusion for at least one specified workload and metric.

A negative conclusion is a valid outcome.

Phase 3: Resolve the physical ternary feasibility questions

Priority: Evidence-dependent

Primary goal: Identify whether a realistic physical device regime could support advantages unavailable to software emulation.

The mathematical information density of three-state representation does not by itself establish an advantage in physical memory or logic.

Current limitation

Investigation 10A established that matched device-characterization data were insufficient to complete the physical evaluation.

The correct disposition is:

PHYSICAL EVALUATION BLOCKED — MATCHED CHARACTERIZATION DATA UNAVAILABLE.

This is an evidence limitation, not a universal physical no-go finding.

Success criteria

Exit condition: A defensible bounded physical disposition or a documented unresolved evidence gap.

No hardware implementation schedule should be inferred from this phase.

Phase 4: Stabilize the contributor-facing runtime

Priority: Ongoing maintenance

Primary goal: Make existing, demonstrable T81 functionality understandable and usable without requiring contributors to reconstruct the entire research history.

Success criteria

This phase should favor stabilization over new subsystem breadth.

Phase 5: Harden the CanonFS interchange lane

Priority: Maintained, not an automatic research blocker

Primary goal: Preserve and improve the RFC-00D1 interchange seed as a usable engineering contract.

Existing seed surface

Success criteria

Contributors can build against the documented seed contract without assuming that all RFC-00D1 proposals are implemented.

Phase 6: Evaluate narrowly scoped architectural extensions

Priority: Deferred until justified

RFC-00D2 remains the target-architecture map, not an implementation schedule.

Potential future work includes:

These are candidates, not committed deliverables.

A new subsystem should be approved only when it can identify:

  1. The hypothesis or engineering deficiency it addresses.
  2. Its dependency on existing validated layers.
  3. The smallest implementation that can answer the question.
  4. A reproducible acceptance test.
  5. A stopping criterion.

Avoid introducing a new architectural layer solely because the existing architecture can accommodate it.

Phase 7: Keep the repository reliable to operate

Priority: Continuous

Primary goal: Maintain trustworthy builds, tests, documentation, and portability without allowing maintenance work to displace the scientific agenda.

Success criteria

What not to do next

Contributor decision rule

Prefer work that produces one of four outcomes:

  1. Resolves a falsifiable research question.
  2. Improves the reproducibility of an existing experiment.
  3. Makes a supported subsystem easier to use or independently verify.
  4. Removes a demonstrated correctness, integrity, or portability defect.

When multiple tasks compete, prioritize experimental validity and correctness over additional architectural breadth.

Each proposed task should identify:

If these cannot be stated clearly, narrow the task before implementation.

Near-term execution sequence

Order Work Completion condition
1 Correct Investigation 08 model-admission parity in PR #602 All five negative cases and regression gate pass
2 Obtain focused independent acceptance Explicit bounded ACCEPT disposition
3 Establish controlled paired performance measurements Raw evidence and defensible statistical analysis
4 Investigate subsystem-specific ternary effects At least one falsifiable bounded result
5 Revisit physical feasibility where matched evidence becomes available Supported physical disposition or documented block
Ongoing Runtime, CanonFS, CI and contributor maintenance Existing contracts remain reliable

Long-term research direction

The long-term objective is not simply to produce a larger ternary software ecosystem.

It is to determine which, if any, properties of ternary representation and computation justify their use over conventional alternatives.

Possible outcomes include:

Each is a legitimate research result when supported by evidence.

T81 advances when uncertainty is reduced—not merely when implementation scope increases.