Status: proposal; no production implementation authorized. Baseline is merged PR #552, main 9a2c12c56a3e7eee02f9bf1041d267f5fbd76136. PR #536 was inspected as still open at 3e52b6b5247b578e5f6a861a1b9a971b6e93c7cd; it is untouched.

Findings a future implementation must preserve

  1. Production fields are balanced base-3 mantissa/direct signed exponent/sign, not the specification’s base-81/BigInt abstraction. Raw factory/deserializer acceptance is wider than the proposed canonical finite subset. In particular, default sign-Z zero, explicit negative zero and raw special payloads must not silently cross a strict validated boundary.
  2. Legacy input conversion has unsigned scale subtraction, host intermediate range dependence, finite precision extraction and incomplete rounding. Output conversion has its own long-double sum/powl/cast and intermediate-range risk. A new input algorithm alone cannot fix the inverse, callers or serialization.
  3. The incompatibility is the bare return type’s lack of outcome information; noexcept does not prohibit expected/result. Throwing would terminate, and returning zero/Inf/NaE cannot report a usable rounded number plus explicit loss.
  4. “Ties to even” needs a total rule for same-parity base-3 exponent-boundary neighbors. Canonical text validation, logical numerical equality and raw byte identity are separate contracts. Cross-platform consistency of wrong values is not conformance.
  5. The prior audit oracle is useful but incomplete: finite nearest-candidate expectations, no inverse bridge or exact/rounding mode, no signed-zero flag, and a decoder that accepts non-shortest exponents. Do not edit that historical oracle or regenerate its corpus as if it had always implemented RFC-00D5.

Caller impact and migration gates

Existing surface inspected Impact of a future checked API Migration gate
T81Float int/float/double and widening constructors Implicit convenience paths currently erase loss; widening round-trips through double and can lose information even when target M grows. Keep signatures/behavior; introduce separately named checked factories. Widening deserves direct field arithmetic in a separate review, not this conversion scope.
T81BigInt::from_float / to_float, fraction bridges (vm.cpp, T81Fraction.hpp) Existing callers may depend on sentinel/truncation behavior and 72/9 bridge precision. Specify exactness/truncation/error at each call site; no blanket textual replacement.
vm.cpp FloatHandle pool, FAdd/FSub/FMul/FDiv Stores native double values and performs native double arithmetic in these cases, not universally T81Float arithmetic. Flags/fault behavior also interact with open #536. Existing ISA state transitions/fault classes/trace bytes cannot be reinterpreted by this draft. Separate freeze review before any integration.
vm.cpp conversion helpers and selected T81Float<72,9> bridges New failures could affect control flow, returned values and trace identities. Checked boundaries must be opt-in outside unchanged opcode contracts first. No new trap mapping invented here.
isa/base81_view.cpp, language numeric formatting, std/math.hpp Parsing/printing through native double can change visible strings when rounding changes. New named conversion profile and explicit formatting policy; preserve old fixture outputs.
Vector/matrix/quaternion scalar helpers and tensor helpers Many expression-based callers cannot consume expected values directly. Inventory policy owners; choose explicit rounded or exact semantics. Do not silently map errors to zero. No inference/performance work in this plan.
T81Int/T81Float serializers and CanonFS consumers Host-native length, unchecked trit/padding/state acceptance and canonical text are distinct. Corrected values can acquire different content hashes. No rewrite of bytes, old CanonFS objects or historical evidence. A validator must inspect raw data before lossy printing, or accept only a separately validated representation.
Integer provenance v1/v2 and conversion audit Current v2 excludes all unsupported float probes; v1 observations are historical. Keep unchanged. Re-admission needs a separately approved conversion profile plus executable numerical/native evidence; a reference-only pass does not qualify.

The additive checked API is the recommended strategy. A legacy wrapper remains viable only with explicitly limited guarantees and preserved behavior. Routing old signatures to new results is a numerical compatibility change even if source code still compiles. Public API additions require the applicable minor-version and freeze approval; representation/canonicalization or ISA changes may require the breaking-change process and cannot be smuggled in as a conversion bug fix.

Proposed implementation sequence, acceptance and stops

Increment Measurable acceptance Stop / do not broaden
0. Contract approval Maintainers resolve all five RFC-00D5 §11 decisions and record selected checked result, canonical subset, limits and rounding/range policies. Any unresolved semantic choice blocks production code. This design PR stops here.
1. Pure checked input boundary Exact binary64 bit decomposition; all 104 versioned corpus results match, including errors/flags; no host FPU dependency in numerical decisions; result metadata never hides rounding. Stop at any oracle disagreement, unchecked integer bound, ambiguous tie or unexplained code/spec difference. Resolve reference/spec first.
2. Pure checked output + validation Exact rational-to-binary64 quotient/remainder algorithm; subnormal/normal carries, range errors, invalid source handling and strict canonical text round trips pass. All raw inputs admitted by a future object adapter have explicit validation tests. Stop if validation requires changing legacy binary layout or silently repairing raw sign/payload/padding. Propose separate governed work.
3. Independent verification Differential exact comparisons against both neighboring outputs and complete small-format enumeration; deterministic-seed large-profile corpus spanning all binary64 exponent fields, precision edges and sign classes; sanitizer checks appropriate to chosen integer backend. Any differing value/status/error/flag is a correctness failure. Matching hashes, approximate tolerances or platform agreement cannot waive it.
4. Native evidence Same approved version/profile/corpus on native Linux x86-64 and macOS ARM64, GCC/Clang where supported; compare actual bits/text and structured outcomes. Mark unavailable Windows/WASM NOT TESTED. No generalized floating-point determinism claim from reference tests or one host. No emulation performance substitution.
5. Explicit caller pilot One host intake/inspection caller opts in with exact/rounded/error policy; legacy API/serialization/opcode regression artifacts remain unchanged; migration docs name identity changes. Stop if a VM opcode/fault, public layout, old fixture or provenance identity must change. Obtain separate approval rather than widening this pilot.

For increment 3, a recommended initial minimum is 100,000 deterministic input encodings including every sign/exponent class and targeted half/carry values; that future number is a coverage target, not evidence produced by this PR. Resource ceilings must follow a proof of intermediate integer bounds for the admitted M/E range; do not invent numerical success on allocation failure. Numeric error precedence and resource failure mapping must remain distinguishable.

Current design verification and remaining approvals

test_reference.py checks the static expected corpus, independent exact neighbor certificates, complete small-format value enumeration against representative sources, inverse binary64 rounding carries, invalid/noncanonical encodings, error precedence, zero flags and rounding alternatives. These are proposal conformance tests, not tests that production already satisfies this contract. The existing audit/provenance data and production headers are unmodified.

Pending maintainer approval: representation subset/bounds and spec reconciliation; checked exact/rounded/error and zero/special/range policies; the completed radix-3 tie rule; API/result/validated-object/resource policy and version/freeze process; canonical text/legacy validation boundary; and the caller/provenance migration sequence. This is the final decision boundary before production implementation.